Logo
 

Bid Solicitation: 19/0278
Header Information
Bid Number: 19/0278 Description: Rd Const at Summerwood Comm Sidewalk along West Lake Houston Pkwy from Bltwy 8 (CIVCAST) Bid Opening Date: 09/09/2019 02:00:00 PM
Purchaser: Antoinette Lewis Organization: Harris County Purchasing Agent
Department: HC - Purchasing Location: ADM - Administration
Fiscal Year: 19 Type Code: BD - Bid Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  08/16/2019 11:00:00 AM
Info Contact: Antoinette Lewis at (713) 274-4402 or e-mail Antoinette.Lewis@pur.hctx.net Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: PRE-BID CONFERENCE on August 26, 2019, 10:00 a.m. CST, in the conference room of the Office of the Harris County Purchasing Agent, 1001 Preston, Suite 670, Houston, TX 77002
Bulletin Desc: Road Construction at Summerwood Community Sidewalk along West Lake Houston Parkway from Beltway 8 to Harris County Flood Control District G103-15-00 for Precinct 1 UPIN 17101MF0KE01 (CIVCAST)
Ship-to Address: DeWight Dopslauf
1001 Preston Street
Suite 670
Houston, TX 77002
US
Email: postmaster@pur.hctx.net
Phone: (713)274-4400
Bill-to Address: DeWight Dopslauf
1001 Preston Street
Suite 670
Houston, TX 77002
US
Email: postmaster@pur.hctx.net
Phone: (713)274-4400
Print Format:
File Attachments: 190278 CivCast Bid Notice
Form Attachments:
Coordinator: Myra Herrera
RFQ or CSP Open in Public?:
Item Information
Item # 1:   ( 913  -  47 )   Road Construction at Summerwood Community Sidewalk along West Lake Houston Parkway from Beltway 8 to Harris County Flood Control District G103-15-00 for Precinct 1 UPIN 17101MF0KE01
NIGP Code: 913  -  47
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   LOT - Lot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 913  -  57 )   Road Construction at Summerwood Community Sidewalk along West Lake Houston Parkway from Beltway 8 to Harris County Flood Control District G103-15-00 for Precinct 1 UPIN 17101MF0KE01
NIGP Code: 913  -  57
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   LOT - Lot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 913  -  82 )   Road Construction at Summerwood Community Sidewalk along West Lake Houston Parkway from Beltway 8 to Harris County Flood Control District G103-15-00 for Precinct 1 UPIN 17101MF0KE01
NIGP Code: 913  -  82
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   LOT - Lot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 765  -  43 )   Road Construction at Summerwood Community Sidewalk along West Lake Houston Parkway from Beltway 8 to Harris County Flood Control District G103-15-00 for Precinct 1 - UPIN 17101MF0KE01
NIGP Code: 765  -  43
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   LOT - Lot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 968  -  61 )   Road Construction at Summerwood Community Sidewalk along West Lake Houston Parkway from Beltway 8 to Harris County Flood Control District G103-15-00 for Precinct 1 UPIN 17101MF0KE01
NIGP Code: 968  -  61
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
1.0   LOT - Lot        
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2019 Periscope Holdings, Inc. - All Rights Reserved. default